The electricity supplier for New Boston Community Power is First Point Power, who can be reached at (888) 875-1711.

This page provides pricing for all New Boston Community Power products, as well as Default Service supply from Eversource. 

Program Prices:

  • Apply to service beginning and ending on the days of the month that your meter is read.
  • Includes a fee of $0.001 per kilowatt-hour (kWh) for the Town’s aggregation consultant. Any applicable taxes will be added to your bill by Eversource.
  • Are available to any new residential or commercial customers. For new industrial customers, the supplier may choose to offer you a price that reflects market conditions at that time. The supplier will ask you to confirm any such price before you are enrolled.
 

Renewable Energy:

  • New Hampshire requires all electricity supply products to include a minimum amount of renewable energy, known as the Renewable Portfolio Standard (RPS). The RPS is comprised of NH Class I, Class II, Class III and Class IV. Learn more at the NH Department of Energy.
  • All New Boston Community Power products meet the minimum RPS; some products contain voluntary renewable energy that exceed the RPS.
  • The New Boston Community Power Program sources all voluntary renewable energy above the RPS from sources that qualify as NH Class I, the State’s designation for “New Renewable Energy”. To qualify for Class I, the source must have begun operation after January 1, 2006, and can come from sources including wind, solar and others listed at the NH Department of Energy.
 

Switching Options: You may switch between program options at any time.

Renewal: At the end of the pricing term, you will be automatically renewed in your current product, which may have a new price and a different percentage of voluntary renewable energy as negotiated by the Town. The Town will announce price changes at least 30 days before any such price change takes effect. Product details will always be available at this website.

Leaving the Program: You may leave the Program at any time without penalty.

Re-Joining the Program: If you leave the Program, you may re-join at any time, however, the supplier may offer you a price that reflects market conditions at the time. The supplier will ask you to confirm any such price before you are enrolled.

Rate (Cents/Kw H) Renewable Program Terms
Default 12.010 34.3% 20 months (March 2024 to November 2025)
Green 50% 12.690 50%
Green 100% 14.690 100%
Basic 11.6101 24.3%
Eversource Default 11.196 24.3% 6 months (August 1st, 2025 to January 31st, 2026)

Renewable energy percentages above are rounded to the nearest whole percent. Customers can opt in, opt out, or change products without fee or penalty effective on the next available meter read date. 

What is DASI and why did it cause the rate to increase?  

The increase is due to a new regulatory requirement called the Day-Ahead Ancillary Services Initiative (DASI). DASI improves the electric grid reliability by ensuring power plants are available on short notice if needed.

DASI was approved by the Federal Energy Regulatory Commission in January 2024 and took effect in March 2025. All electricity suppliers, including New Boston’s, must now pay DASI-related costs. These costs will be included in Eversource’s Default Service rates, and future New Boston Community Power contracts.

Past Eversource Default Rates:

  • 10.669 ¢/kWh (2/1/22 to 7/31/22) 
  • 22.566 ¢/kWh (8/1/22 to 1/31/23) 
  • 20.221 ¢/kWh (2/1/23 to 7/31/23)  
  • 12.582 ¢/kWh (8/1/23 to 1/31/24) 
  • 8.285 ¢/kWh (2/1/24 to 7/31/24)  
  • 10.40 ¢/kWh (8/1/24 to 1/31/25)
  • 8.929 ¢/kWh (2/1/25 to 7/31/25)
  • 11.196 ¢/kWh (8/1/25 to 1/31/26)